Implemented projects in 2008
Project: "Street sewerage collector, Boruna quarter – I stage"
Objective: Reinforcement of Boruna quarter which falls into landslide area in the North-West part of the town. About 3000 people live in Boruna quarter. Rehabilitation of Al. Stamboliiski Street which is part of the republican road E-79
Result: Sewerage collector constructed with total length 450 m, made of PEHD-SDR-26. Section 1 – 230 m F – 315 and Section 2 – 220 m F-400. New asphalt pavement laid, sidewalks and curb stones
Value: 1 454 000 BGN
Source: Ministry of regional development, Republican Road Infrastructure and the Municipality of Lom
Project: "Construction of sewerage on Simeon Street, Artanes Street and Lozengrad
Objective: Prevention of landslide processes in the high part of the town by construction of collector
Result: Sewerage with length 1100 m constructed. Rehabilitation of the streets – new road pavement, sidewalks and curb stones
Value: 376 000 BGN
Source: Social Investment Fund and the Municipality of Lom
Project: "Construction of sewerage, water-conduit and road pavement of Hadzhi Dimitar Street" – II stage
Objective: Improvement of the way of life of the resident of the town of Lom
Result: Replaced water-conduit and sewerage constructed on Dobrudzha Street”
Value: 200 000 BGN
Source: Municipality of Lom
Page updated: 15.02.2012
Content validity: 31.12.2012
This web-site is updated under the "Municipality of Lom – new, effective and quality, the administration is at your service!" Project, implemented by the Municipality of Lom with the financial support of grant scheme of Operational programme "Administrative capacity", co-financed by the European Union through the European Social Fund. Investments in people!

