Implemented projects in 2006
Project: "Ecologic and energy-saving rehabilitation of external artificial lightning of the town of Lom"
Objective: 100% ecologic illumination of the streets in the town of Lom. Before the implementation of the project the illumination was 18%
Result: The project includes 13 streets and 4 parks, 1 639 street and 103 park lightning were replaced with street lightning set of sodium lamps with high pressure and ecologic effect. The expected economies of the two stages of implementation amount to 1 716 002 kWh per year and 232 892 BGN per year
Value: 452 000 BGN interest-free loan
Source: Enterprise for management of the activities for preservation of the environment (PUDOOS) of the Ministry of environment and waters
Project: "Rehabilitation of street pavements and sidewalks, town of Lom"
Objective: Repair of the streets and sidewalks in the central part of the town of Lom
Result: 17 streets in Lom rehabilitated – 5 264 km street and sidewalk pavement, improved way of life of 29 000 residents
Value: 784 170 Euro
Source: SAPARD Programme, SAPARD Agency of the Ministry of agriculture and food
Project: "Construction of support wall of Mladenovo quarter"
Objective: Reinforcement of crumbled territory on Zamfirovsko Shose Street in Mladenovo quarter because of high subsoil waters and prevention of the danger of collapse of buildings and streets
Result: Support wall constructed – 120 m
Value: 168 000 BGN
Source: The Permanent Commission for Protection of the Population in case of Natural Disasters, Damages and Accidents (PKZNBAK)
Project: "Repair of chitalishte (community centre) "Postoianstvo"
Objective: Improvement of the conditions for expression of the art groups in the community centre and the public
Result: Repair of the big hall, chamber hall and foyer
Value: 144 000 BGN
Source: Beautiful Bulgaria Programme and the Municipality of Lom
Project: "Correction and reinforcement of right coast of Lom river" – II stage
Objective: Reinforcement of the crumbled right coast of Lom river and prevention of flooding in high waters of the rivers
Result: 200 m embankment constructed
Value: 168 000 BGN
Source: The Permanent Commission for Protection of the Population in case of Natural Disasters, Damages and Accidents (PKZNBAK)
Page updated: 15.02.2012
Content validity: 31.12.2012
This web-site is updated under the "Municipality of Lom – new, effective and quality, the administration is at your service!" Project, implemented by the Municipality of Lom with the financial support of grant scheme of Operational programme "Administrative capacity", co-financed by the European Union through the European Social Fund. Investments in people!

